156
12. Raise the TU-11/12 bases to their highest position. Clean and lubricate the lifting screw with quad ring
grease 919-021.
13. Check the wire collector belt for wear.
Collector with cover removed.
CHECKING THE CR CALIBRATION
For this procedure to work, the machine has to have been powered up and has gone through the start-up
reference. (Ready to run parts)
Make sure the machine is in E-stop.
If you are using the old reference fixture:
Place the
Master Reference Fixture 5-144860
in the cutter head. Close the cutter head and place the pivot
arms into it.
Lifting screw
Collector belt
Содержание CR.11
Страница 129: ...129 8M Sec guard Notice this transition ...
Страница 145: ...145 ...
Страница 174: ...174 Spacer block not installed Spacer block installed Spacer block ...
Страница 178: ...178 Installing the monitor Use the 4 screws provided to mount the monitor Plug in the cords UBS cord from computer ...
Страница 182: ...182 The wiring diagram in shows the main power connection coming into the machine ...