115
Using Process Funnels for Closed Barrel
This is a photo of the wire funnel device for closed barrel
The first step is the funnel.
‐
Set the pivot so the wire is in line with the terminal, it should be the same as the second step, Crimp.
‐
Set the Arrive position so that the wire is in front of the funnel and does not bump into anything during the
swing.
‐
Set the process position so that the stripped end of the wire is inserted into the terminal, but not so far
that the strip shoulder of the wire is bumping the funnel and pushing the wire up.
‐
Set the depart position so it is exactly the same as the process position.
‐
The post trip time is the amount of time that the machine waits for the funnel to drop before it the arm
begins to move to the crimping step.
Содержание CR.11
Страница 129: ...129 8M Sec guard Notice this transition ...
Страница 145: ...145 ...
Страница 174: ...174 Spacer block not installed Spacer block installed Spacer block ...
Страница 178: ...178 Installing the monitor Use the 4 screws provided to mount the monitor Plug in the cords UBS cord from computer ...
Страница 182: ...182 The wiring diagram in shows the main power connection coming into the machine ...