![Arcteq AQ-C215 Скачать руководство пользователя страница 341](http://html1.mh-extra.com/html/arcteq/aq-c215/aq-c215_instruction-manual_2964938341.webp)
Input signals
Digital inputs
Software signals
Output signals
Close command output
Open command output
Operation time
Breaker traverse time setting
0.02…500.00 s, setting step 0.02 s
Max. close/open command pulse length
0.02…500.00 s, setting step 0.02 s
Control termination time out setting
0.02…500.00 s, setting step 0.02 s
Inaccuracy:
- Definite time operating time
±0.5 % or ±10 ms
Breaker control operation time
External object control time
<75 ms
Object control during auto-reclosing
See the technical sheet for the auto-reclosing function.
9.2.2.3 Switch-on-to-fault (SOTF)
Table. 9.2.2.3 - 286. Technical data for the switch-on-to-fault function.
Initialization signals
SOTF activate input
Any IED blocking input signal (Object closed signal, etc.)
Pick-up
SOTF function input
Any IED blocking input signal (I> or similar)
SOTF activation time
Activation time
<40 ms (measured from the trip contact)
SOTF release time
Release time setting
0.000…1800.000 s, setting step 0.005 s
Inaccuracy:
- Definite time
±1.0 % or ±30 ms
SOTF instant release time
<40 ms (measured from the trip contact)
9.2.3 Monitoring functions
9.2.3.1 Current transformer supervision
Table. 9.2.3.1 - 287. Technical data for the current transformer supervision function.
Measurement inputs
Current inputs
Phase current inputs: I
L1
(A), I
L2
(B), I
L3
(C)
Residual current channel I
01
(Coarse) (optional)
Residual current channel I
02
(Fine) (optional)
Current input magnitudes
RMS phase currents
RMS residual current (I
01
, I
02
) (optional)
Pick-up
Pick-up current settings:
- I
SET
high limit
- I
SET
low limit
- I
SUM
difference
- I
SET
ratio
- I2/I1 ratio
0.10…40.00 × I
N
, setting step 0.01 × I
N
0.10…40.00 × I
N
, setting step 0.01 × I
N
0.10…40.00 × I
N
, setting step 0.01 × I
N
0.01…100.00 %, setting step 0.01 %
0.01…100.00 %, setting step 0.01 %
A
AQ
Q-C215
-C215
Instruction manual
Version: 2.07
© Arcteq Relays Ltd
IM00040
339
Содержание AQ-C215
Страница 1: ...AQ C215 Capacitor bank protection IED Instruction manual ...
Страница 2: ......
Страница 297: ...Figure 7 4 179 Example block scheme A AQ Q C215 C215 Instruction manual Version 2 07 Arcteq Relays Ltd IM00040 295 ...
Страница 318: ...Figure 8 14 200 Device installation A AQ Q C215 C215 Instruction manual Version 2 07 316 Arcteq Relays Ltd IM00040 ...
Страница 347: ...10 Ordering information A AQ Q C215 C215 Instruction manual Version 2 07 Arcteq Relays Ltd IM00040 345 ...