![Arcteq AQ-C215 Скачать руководство пользователя страница 174](http://html1.mh-extra.com/html/arcteq/aq-c215/aq-c215_instruction-manual_2964938174.webp)
Figure. 5.4.12 - 124. General presumptions of high-voltage cables.
If the installation conditions vary from the presumed conditions manufacturers may give additional
information on how to correct the the current-carrying capacity to match the changed conditions.
Below is an example of the correction factors provided a manufacturer (Prysmian) for correcting the
current-carrying capacity.
A
AQ
Q-C215
-C215
Instruction manual
Version: 2.07
172
© Arcteq Relays Ltd
IM00040
Содержание AQ-C215
Страница 1: ...AQ C215 Capacitor bank protection IED Instruction manual ...
Страница 2: ......
Страница 297: ...Figure 7 4 179 Example block scheme A AQ Q C215 C215 Instruction manual Version 2 07 Arcteq Relays Ltd IM00040 295 ...
Страница 318: ...Figure 8 14 200 Device installation A AQ Q C215 C215 Instruction manual Version 2 07 316 Arcteq Relays Ltd IM00040 ...
Страница 347: ...10 Ordering information A AQ Q C215 C215 Instruction manual Version 2 07 Arcteq Relays Ltd IM00040 345 ...