VP5000-DC/DC60, VP5000-DC/DC200-HL
Installation and commissioning
Last edited 2019-02-08
by Sonja Scheunert
Filename
VP5000_DCDC60_200-HL_installation_manual_v1-4en.docx
129 / 173
Figure 96: Example of double nipple from Pflitsch,
blueglobe TRI type
Screw the EMC cable gland into the
housing:
(Here shown using the example of an EMC
cable gland from Pflitsch, blueglobe TRI type.)
1.
Screw the double nipple (2) with the
thread (a) into the respective opening of
the housing.
2.
Tighten the double nipple with the torque
specified by the manufacturer.
3.
Repeat the procedure until all double
nipples (2) are screwed into the device.
Figure 97: Example of a screwed-in double nipple
with spring (Pflitsch, blueglobe TRI type)
4.
Insert the spring (1) into the double nipple
(2) of the EMC cable gland.
5.
Repeat the procedure until all springs (1)
are inserted into all double nipples (2).
Figure 98: Covers on the VECTOPOWER VP5000-
DC/DC200-HL
Open the housing:
•
The connections for [/-] and
[DC+/-] are located under the cover (1).
•
The connections for [BR+/-] are located
under the cover (2).
6.
Open the screws for the covers (1) + (2).
7.
Remove the covers (1) + (2).