Instructions on how to proceed:
i
Note on malfunctions
For each individual application, a parameter set (I/Os with values) and, if required, modules (to
extend the functionality) are created in VE. These are specially adapted to a VE version.
If the VE version is changed, the modules are not executed correctly and the I/Os are not called
or stored correctly. These problems usually occur when VE is started. In very rare cases,
malfunctions may occur during operation.
•
Use the VE version for which the parameter set and the modules were created.
1.
Follow the instructions in the VEConfig operating manual, chapter Commissioning and
parameterization of a device, Commissioning, Initial commissioning with the wizard.
2.
Connect the power supply to the control part of the VECTOPOWER.
•
If the device is not found with <Search for devices on all interfaces>, check the wiring and the
PIN assignment. For a CAN-USB cable, select "CAN bus byte rate 500 kBit/s". The factory
default setting of the device is the CAN bus byte rate of 500 kBit/s.
Figure 108: VEConfig: Display of the CAN bus networks
CAUTION!
Danger from noise
The VECTOPOWER generates noise during operation.
•
If necessary, wear hearing protection when working on or near the VECTOPOWER.
3.
To optimize your application, refer to the VE operating manual.
•
Measure the current and voltage values at [DC+/-] and [/-].