VP5000-DC/DC60, VP5000-DC/DC200-HL
Installation and commissioning
Last edited 2019-02-08
by Sonja Scheunert
Filename
VP5000_DCDC60_200-HL_installation_manual_v1-4en.docx
137 / 173
Figure 107: VEConfig: Display of the CAN bus networks
CAUTION!
Danger from noise
The VECTOPOWER generates noise during operation.
•
If necessary, wear hearing protection when working on or near the VECTOPOWER.
3.
To optimize your application, refer to the VE operating manual.
•
Measure the current and voltage values at [DC+/-] and [/-].
•
Depending on the system and application, further measurements and actions may be required
before the system can function satisfactorily. For instance:
- Use additional external capacitors
- Measures to establish electromagnetic compatibility
- Measures for sound insulation
- Measures to protect against accidental contact with hot surfaces.
Results:
•
All parameters are set.
•
All design measures have been determined and implemented.
•
The VECTOPOWER is ready for operation.
•
ARADEX AG recommends observing the behavior of the device during real operation and
making further adjustments if necessary.