![Applied Biosystems QuantStudio 6 Flex Скачать руководство пользователя страница 68](http://html.mh-extra.com/html/applied-biosystems/quantstudio-6-flex/quantstudio-6-flex_user-manual_2955112068.webp)
6.
Load the RNase P plate or array card into the instrument:
a.
From the instrument touchscreen, tap to eject the instrument tray.
b.
Load the plate or array card into the plate holder so that:
• Well A1 of the plate or array card is in the top-left corner of the adapter.
• The barcode faces the front of the instrument.
IMPORTANT!
Plates and array cards should be loaded and unloaded by
operators who have been warned of the moving parts hazard and have been
adequately trained.
c.
From the instrument touchscreen, touch to close the instrument tray.
7.
After loading the plate or array card, start the instrument verification test:
a.
In the Overview screen, select Check the box when the RNase P plate has
been loaded, then click Next.
b.
In the Run screen, click Start Run to start the test.
IMPORTANT!
Do not attempt to open the access door during the run. The door
is locked while the instrument is in operation.
Note:
Before starting the instrument verification test, the instrument may pause
(up to 10 minutes) to allow the heated cover to reach the required temperature.
Chapter 2
Calibrate the instrument
Verify the instrument performance
2
68
QuantStudio
™
6 and 7 Flex Real-Time PCR Systems v1.6 Maintenance and Administration Guide