3.
Lubricate the roller chain
1
from the inside
going out.
4.
Check chain tensioner
2
for ease of movement.
5.
Install the cover.
6.
Install the bolts.
CMS-I-00004156
10.2.2 Lubricating the roller chain on the electric agitator shaft drive
INTERVAL
After the first 10 operating hours
Every 50 operating hours
or
at the end of the season
1.
Remove the bolts
1
.
2.
Remove the cover
2
.
CMS-I-00004157
CMS-T-00007652-A.1
10 | Repairing the machine
Lubricating the roller chains
MG6659-EN-GB | F.1 | 25.10.2022 | © AMAZONE
176