![Amazone Precea 3000-A Скачать руководство пользователя страница 155](http://html1.mh-extra.com/html/amazone/precea-3000-a/precea-3000-a_original-operating-manual_2919773155.webp)
Repairing the machine
10
10.1 Maintaining the machine
10.1.1 Maintenance schedule
After initial operation
Checking the tightening torque for the radar sensor
bolts
Checking the coulter connection tightening torque
Checking the hydraulic hose lines
at the end of the season
Cleaning the distributor head
daily
Checking the top link pin and lower link pin
Every 12 months
Checking the tightening torque for the radar sensor
bolts
Checking the coulter connection tightening torque
Every 10 operating hours / daily
Cleaning the cyclone separator
Cleaning the suction basket
Cleaning the fertiliser metering unit
Cleaning the micropellet metering unit
Clean the singling unit
Every 50 operating hours / weekly
Checking the hydraulic hose lines
CMS-T-00003757-D.1
CMS-T-00003758-D.1
10 | Repairing the machine
MG6659-EN-GB | F.1 | 25.10.2022 | © AMAZONE
149