![Aerco Benchmark BMK 1500DF Скачать руководство пользователя страница 49](http://html.mh-extra.com/html/aerco/benchmark-bmk-1500df/benchmark-bmk-1500df_user-manual_2861523049.webp)
Benchmark 2500 - 3000 Boilers
CHAPTER 3 – OPERATION
OMM-0094_0F
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
Page
49
of
207
GF-137
Ph.: 800-526-0288
09/30/2015
Figure 3-3b:
BMK 3000:
SSOV Location
3.
With all required safety device switches closed, a purge cycle will be initiated and the
following events will occur:
a. The Blower relay energizes and turns on the blower.
b. The Air/Fuel Valve rotates to the full-open purge position and closes purge position
switch. The dial on the Air/Fuel Valve (Figure 3-4) will read
100
to indicate that it is
full-open (100%).
c. The
VALVE POSITION
bargraph will show 100%.
Figure 3-4: Air/Fuel Valve In Purge Position
4.
Next, the
Blower Proof
switch on the Air/Fuel Valve (Figure 3-5) closes. The display
will show
PURGING
and indicate the elapsed time of the purge cycle in seconds.
STEPPER
MOTOR
TO BLOWER
AIR IN
PURGE
VALVE POSITION
DIAL AT 100%
SSOV
TO
AIR/FUEL
VALVE
NATURAL
GAS INLET
HIGH GAS
PRESSURE
SWITCH
MANUAL
SHUT-OFF
VALVE
LOW GAS
PRESSURE
SWITCH