Benchmark 2500 - 3000 Boilers
CHAPTER 2 – INSTALLATION
Page
24
of
207
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
OMM-0094_0F
09/30/2015
Ph.: 800-526-0288
GF-137
2.9 AC ELECTRICAL POWER WIRING
The AERCO Benchmark Electrical Power Wiring Guide, GF-2060, must be consulted prior to
connecting any AC power wiring to the unit. External AC power connections are made to the
unit inside the Power Box on the front of the unit. Remove the front panel to access the Power
Box, which is mounted in the upper right corner of the unit as shown in Figure 2-8. Loosen the
two upper screws of the Power Box cover and remove cover to access the internal connections
shown in Figure 2-9.
Figure 2-8: Power Box Location with Cover Closed
WARNING!
THE POWER BREAKER SHOWN IN FIGURE 2-9 DOES
NOT
REMOVE POWER FROM THE TERMINAL BLOCKS.
Figure 2-9: Power Box Internal Components
With the exception of the transformer shown in Figure 2-9, all of the components in the Power
Box are mounted on a DIN rail.
WIRE CONDUITS
POWER
BREAKER
TRANSFORMER
12V POWER
SUPPLY
FUSE BLOCKS (2)
TERMINAL BLOCKS
24V POWER
SUPPLY