Benchmark 2500 - 3000 Boilers
CHAPTER 2 – INSTALLATION
OMM-0094_0F
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
Page
33
of
207
GF-137
Ph.: 800-526-0288
09/30/2015
Install the Sequencing Isolation Valve –
Continued
Figure 2-14: Sequencing Isolation Valve Installed
3. Remove the jumper wire from the Molex connector and then plug it into the sequencing
isolation valve’s connector.