Benchmark 2500 - 3000 Boilers
CHAPTER 1 – SAFETY PRECAUTIONS
Page
12
of
207
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
OMM-0094_0F
09/30/2015
Ph.: 800-526-0288
GF-137
WARNING!
A three-pole switch must be installed on the electrical supply line of the
unit. The switch must be installed in an easily accessible position to quickly
and safely disconnect electrical service. Do not affix switch to unit sheet
metal enclosures.
CAUTION
Many soaps used for gas pipe leak testing are corrosive to metals. The
piping must be rinsed thoroughly with clean water after leak checks have
been completed.
CAUTION
DO NOT use this boiler if any part has been under water. Call a qualified
service technician to inspect and replace any part that has been under
water.
1.2 EMERGENCY SHUTDOWN
If overheating occurs or the gas supply fails to shut off, close the manual gas shutoff valve
(Figure 1-1) located external to the unit.
NOTE
The Installer must identify and indicate the location of the
emergency shutdown manual gas valve to operating personnel.
Figure
1-1: Manual Gas Shutoff Valve
1.3 PROLONGED SHUTDOWN
After prolonged shutdown, it is recommended that the startup procedures in Chapter 4 and the
safety device test procedures in Chapter 6 of this manual be performed, to verify all system-
operating parameters. If there is an emergency, turn off the electrical power supply to the
AERCO boiler and close the manual gas valve located upstream the unit. The installer must
identify the emergency shut-off device.
MANUAL GAS SHUT-OFF VALVE
VALVE OPEN
VALVE CLOSED