![Aerco Benchmark BMK 1500DF Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/aerco/benchmark-bmk-1500df/benchmark-bmk-1500df_user-manual_2861523016.webp)
Benchmark 2500 - 3000 Boilers
CHAPTER 2 – INSTALLATION
Page
16
of
207
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
OMM-0094_0F
09/30/2015
Ph.: 800-526-0288
GF-137
2.4 SITE PREPARATION
Ensure that the site selected for installation of the Benchmark 2500/3000 Boiler includes:
•
Access to AC Input Power at 208 VAC, Three-Phase, 60 Hz @ 10 Amps OR 460 VAC,
Three-Phase, 60 Hz @ 5 Amps
•
Access to Natural Gas line at a
minimum
pressure of
8 inches W.C. (1993 Pa)
at gas
flow:
o
BMK 2500
– 2,500,000 BTU/hr. (732 kW) energy input
o
BMK 3000 –
3,000,000 BTU/hr. (879 kW) energy input
2.4.1 Installation Clearances
The Benchmark Model 2500 and 3000 are packaged in an enclosure having identical exterior
dimensions. The unit must be installed with the prescribed clearances for service as shown in
Figure 2-1a. The minimum clearance dimensions, required by AERCO, are listed below.
However, if Local Building Codes require additional clearances, these codes shall supersede
AERCO’s requirements. Minimum acceptable clearances required are as follows:
•
Sides: 24 inches (61 cm)
•
Front: 24 inches (61 cm)
•
Rear: 24 inches (61 cm)
•
Top: 18 inches (45.7 cm)
All gas piping, water piping and electrical conduit or cable must be arranged so that they do not
interfere with the removal of any panels, or inhibit service or maintenance of the unit.
Figure 2-1a: Benchmark Boiler Model 2500 Clearances
NOTE
Ensure that
condensate
assembly is not
located over the
housekeeping pad.
Housekeeping Pad.
FRONT
REAR