4601 I-V Meter Operation Manual
1.8.3 Transport
1-19
1.8.3
Transport
To transport the 4601, use the original box that it came in. If the box is not available any longer, pack the
4601 in accordance with the following guidelines.
Packing procedure
1. Prepare a corrugated cardboard box with dimensions that are larger than the
external dimensions of the 4601 by 15 cm or more to allow for shock absorbent
material.
2. Wrap the 4601 with a protective sheet.
3. Line the box with shock absorbing material so that the 4601 is protected on all
sides.
4. Close the box with industrial staples or use packing tape.
When sending the 4601 to an ADC CORPORATION sales representative for service or repairs, attach a
label stating the following items.
•
Company name and address
•
Name of the person in charge
•
Serial number (shown on the rear panel)
•
Type of service required
1.9
Warm-up Time
Allow the 4601 to warm up for at least 60 minutes after turning on the power to ensure the specified accuracy
of the 4601. After warm-up, execute zero measurement.
1.10 Calibration
Calibrate the 4601 in accordance with the procedure described in Chapter 8. “CALIBRATION.”
When asking ADC for calibration service, contact an ADC CORPORATION sales representative.
Recommended calibration interval
1 year
Содержание 4601 I-V Meter
Страница 2: ......
Страница 8: ......
Страница 14: ......
Страница 18: ......
Страница 70: ...4601 I V Meter Operation Manual 3 4 1 Menu Structure 3 18...
Страница 80: ......
Страница 92: ......
Страница 129: ...4601 I V Meter Operation Manual 5 6 1 Synchronous Operation 5 37...
Страница 146: ......
Страница 182: ......
Страница 230: ......