4601 I-V Meter Operation Manual
5.7 Self Test
5-47
+135 ADC3 operation IR5-IR6 ratio
ADC3 Ratio 5 to 6
+141 ADC1 operation ZERO measurement
(AZ10)
ADC1 Zero (AZ10)
+142 ADC2 operation ZERO measurement
(AZ20)
ADC2 Zero (AZ20)
+143 ADC3 operation ZERO measurement
(AZ30)
ADC3 Zero (AZ30)
+144 ADC3 operation ZERO measurement
(AZ31)
ADC3 Zero (AZ31)
+145 ADC3 operation ZERO measurement
(AZ32)
ADC3 Zero (AZ32)
+146 ADC3 operation ZERO measurement
(AZ33)
ADC3 Zero (AZ33)
+147 ADC3 operation ZERO measurement
(AZ34)
ADC3 Zero (AZ34)
+201 VSVM 5V ZERO
VSVM 5V Zero
+202 VSVM 5V +FS
VSVM 5V +Full Scale
+203 VSVM 5V -FS
VSVM 5V -Full Scale
+204 VSVM 50V ZERO
VSVM 50V Zero
+205 VSVM 50V +FS
VSVM 50V +Full Scale
+206 VSVM 50V -FS
VSVM 50V -Full Scale
+207 VSVM 300V ZERO
VSVM 300V Zero
+208 VSVM 300V +FS
VSVM 300V +Full Scale
+209 VSVM 300V -FS
VSVM 300V -Full Scale
+211 IM 300
A ZERO
IM 300
A Zero
+212 IM 3mA ZERO
IM 3mA Zero
+213 IM 30mA ZERO
IM 30mA Zero
+214 IM 300mA ZERO
IM 300mA Zero
+215 IM 3A ZERO
IM 3A Zero
+216 IM 10A ZERO
IM 10A Zero
+301 OVV detection check
OVV Check
+302 OVL detection check
OVL Check
Table 5-12 Self Test Items (2 of 3)
Error
code
Description
Executing method
Message
Power
ON
*TST?
Key
operation
Содержание 4601 I-V Meter
Страница 2: ......
Страница 8: ......
Страница 14: ......
Страница 18: ......
Страница 70: ...4601 I V Meter Operation Manual 3 4 1 Menu Structure 3 18...
Страница 80: ......
Страница 92: ......
Страница 129: ...4601 I V Meter Operation Manual 5 6 1 Synchronous Operation 5 37...
Страница 146: ......
Страница 182: ......
Страница 230: ......