4601 I-V Meter Operation Manual
5.6.3 Series Connection
5-41
Example) Operate/Standby procedure when the PV output voltage is 500 V
<Operate procedure>
No.2 setting voltage
500 V - 300 V (= 200 V)
No.1 setting voltage = 0 V
Set No.2 to Operate.
Set No.1 to Operate.
No.2 setting voltage = 0 V
Set the source voltage.
•
When setting the output voltage to 300 V or less, set the No.2 output voltage.
•
When setting the output voltage to 500 V, set the No.2 output voltage to 300 V and set the No.1
output voltage to 200 V.
<Standby procedure>
No.1 setting voltage = 0 V
No.2 setting voltage
500 V - 300 V (= 200 V)
Set No.1 to Standby.
Set No.2 to Standby.
1
2
3
4
5
6
1
2
3
4
Содержание 4601 I-V Meter
Страница 2: ......
Страница 8: ......
Страница 14: ......
Страница 18: ......
Страница 70: ...4601 I V Meter Operation Manual 3 4 1 Menu Structure 3 18...
Страница 80: ......
Страница 92: ......
Страница 129: ...4601 I V Meter Operation Manual 5 6 1 Synchronous Operation 5 37...
Страница 146: ......
Страница 182: ......
Страница 230: ......