Note
Action
xx1800003008
Loosen the screws and move the motor slightly
to slacken the timing belt.
3
xx1800003009
Remove the screws and washers.
4
Cooling pad location
xx1800003604
Carefully lift out the motor.
CAUTION
A cooling pad is attached to the motor, which may
stick to the casting. Always use a plastic sheet
with caution to remove the pad from the casting.
Pay attention not to scratch the casting or damage
the pad.
5
Continues on next page
126
Product manual - IRB 1100
3HAC064992-001 Revision: C
© Copyright 20192020 ABB. All rights reserved.
5 Repair
5.3.1 Replacing the upper cable package
Continued
Содержание IRB 1100
Страница 1: ...ROBOTICS Product manual IRB 1100 ...
Страница 2: ...Trace back information Workspace 20B version a15 Checked in 2020 06 01 Skribenta version 5 3 033 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 36: ...This page is intentionally left blank ...
Страница 588: ...This page is intentionally left blank ...
Страница 610: ...This page is intentionally left blank ...
Страница 614: ......
Страница 615: ......