Securing the upper cable package to the axis-2 gearbox
Note
Action
Screw: M2.5x6 12.9 Gleitmo
603+Geomet 500 (2 pcs)
Refit the cable bracket.
1
Tightening torque: 0.6 Nm
xx1800003002
Refitting the axis-6 motor
Note
Action
Check that:
•
all assembly surfaces are clean and without
damages
•
the motor is clean and undamaged.
1
Motor orientation: orient the motor
according to the figure below, in
regard to the encircled motor con-
nector.
xx1800003023
Orient the motor correctly and fit it into the lower
arm.
Tip
Leave the connectors FB5 and FB6 accessible
from the process hub and the connectors MP5
and MP6 accessible from wrist side.
2
Continues on next page
140
Product manual - IRB 1100
3HAC064992-001 Revision: C
© Copyright 20192020 ABB. All rights reserved.
5 Repair
5.3.1 Replacing the upper cable package
Continued
Содержание IRB 1100
Страница 1: ...ROBOTICS Product manual IRB 1100 ...
Страница 2: ...Trace back information Workspace 20B version a15 Checked in 2020 06 01 Skribenta version 5 3 033 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 36: ...This page is intentionally left blank ...
Страница 588: ...This page is intentionally left blank ...
Страница 610: ...This page is intentionally left blank ...
Страница 614: ......
Страница 615: ......