
Refitting the base cover
Notice that the procedure differs depending on if the connector interface is located
either at the rear or at the bottom of the base.
Note
Action
Apply grease to the cable package, cover all
moving area of the package.
1
Apply grease to the covers that have contacting
area with the cable package.
2
Route and secure the cabling with cable straps.
CAUTION
Correct cable routing is highly important.
If the cables are routed and secured incorrectly
the cables can be damaged.
3
Screw: M3x8 Steel 8.8-A2F (7 pcs)
Valid for cabling with rear interface
4
Tightening torque: 1.2 Nm
Refit the bottom cover.
xx1800003035
Screw: M3x8 12.9 Gleitmo
603+Geomet 500 (6 pcs)
Valid for cabling with bottom interface (option
3309-1)
5
Tightening torque: 1.2 Nm
Refit the rear cover.
xx1800003057
Continues on next page
178
Product manual - IRB 1100
3HAC064992-001 Revision: C
© Copyright 20192020 ABB. All rights reserved.
5 Repair
5.3.2 Replacing the lower cable package
Continued
Содержание IRB 1100
Страница 1: ...ROBOTICS Product manual IRB 1100 ...
Страница 2: ...Trace back information Workspace 20B version a15 Checked in 2020 06 01 Skribenta version 5 3 033 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 36: ...This page is intentionally left blank ...
Страница 588: ...This page is intentionally left blank ...
Страница 610: ...This page is intentionally left blank ...
Страница 614: ......
Страница 615: ......