Note
Action
Motor orientation: orient the motor
according to the figure below, in
regard to the encircled motor con-
nector.
xx1800003072
Orient the motor correctly and fit it into the base.
At the same time, install the timing belt to the
gearbox pulley and verify that the belt runs cor-
rectly in the groove of the pulley.
4
Screw: M4x16 12.9 Gleitmo
603+Geomet 500 (3 pcs)
Refit the screws and washers.
Note
Do not tighten the screws yet.
5
Washer, 3HAC063985-001 (3 pcs)
xx1800003065
Adjusting the axis-1 timing belt tension
Note
Action
xx1900000040
Use a handheld tensiometer hooking to the motor.
1
Continues on next page
Product manual - IRB 1100
261
3HAC064992-001 Revision: C
© Copyright 20192020 ABB. All rights reserved.
5 Repair
5.4.2 Replacing the swing
Continued
Содержание IRB 1100
Страница 1: ...ROBOTICS Product manual IRB 1100 ...
Страница 2: ...Trace back information Workspace 20B version a15 Checked in 2020 06 01 Skribenta version 5 3 033 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 36: ...This page is intentionally left blank ...
Страница 588: ...This page is intentionally left blank ...
Страница 610: ...This page is intentionally left blank ...
Страница 614: ......
Страница 615: ......