Removing the upper cable package
Use these procedures to remove the upper cable package.
Preparations before removing the upper cable package
Note
Action
Decide which calibration routine to use, and take
actions accordingly prior to beginning the repair
procedure.
1
xx1800003289
Jog the robot to the specified position:
•
Axis 1: 0°
•
Axis 2: 110° (IRB 1100-4/0.475) /95° (IRB
1100-4/0.58)
•
Axis 3: -20° (IRB 1100-4/0.475)/ -6° (IRB
1100-4/0.58)
•
Axis 4: 0°
•
Axis 5: 0°
•
Axis 6: No significance.
2
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the safeguarded
space.
3
Removing the axis-2 motor
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
xx1800002488
Remove the swing support cover.
2
Continues on next page
Product manual - IRB 1100
113
3HAC064992-001 Revision: C
© Copyright 20192020 ABB. All rights reserved.
5 Repair
5.3.1 Replacing the upper cable package
Continued
Содержание IRB 1100
Страница 1: ...ROBOTICS Product manual IRB 1100 ...
Страница 2: ...Trace back information Workspace 20B version a15 Checked in 2020 06 01 Skribenta version 5 3 033 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 36: ...This page is intentionally left blank ...
Страница 588: ...This page is intentionally left blank ...
Страница 610: ...This page is intentionally left blank ...
Страница 614: ......
Страница 615: ......