
Note
Action
Initial referenced force for used
belt: 68.18-75.04 N (for reference
only)
Use a handheld tensiometer hooking to the screw
and pull the tensiometer to reach the initial refer-
enced force.
8
Initial referenced force for new belt:
97.4-107.2 N
xx1900000029
Tightening torque: 3.5 Nm
xx1800002493
Secure the motor with the screws.
9
Used belt: 163-174 Hz
Use an acoustic tensiometer to measure the tim-
ing belt tension.
10
New belt:180-229 Hz (for reference
only)
If the timing belt tension does not meet the require-
ment, loosen the motor screws and readjust.
11
Continues on next page
Product manual - IRB 1100
275
3HAC064992-001 Revision: C
© Copyright 20192020 ABB. All rights reserved.
5 Repair
5.4.2 Replacing the swing
Continued
Содержание IRB 1100
Страница 1: ...ROBOTICS Product manual IRB 1100 ...
Страница 2: ...Trace back information Workspace 20B version a15 Checked in 2020 06 01 Skribenta version 5 3 033 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 36: ...This page is intentionally left blank ...
Страница 588: ...This page is intentionally left blank ...
Страница 610: ...This page is intentionally left blank ...
Страница 614: ......
Страница 615: ......