Note
Action
xx1800002496
Remove the timing belt from its groove on the
motor.
11
Loosening the cable package from axis-1 gearbox
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
xx1800003032
Access the cable package locking screw on the
axis-1 gearbox from the swing and then loosen
the locking screw.
2
Remove the locking screw.
3
Disconnecting the connectors at the division point
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
Continues on next page
Product manual - IRB 1100
241
3HAC064992-001 Revision: C
© Copyright 20192020 ABB. All rights reserved.
5 Repair
5.4.2 Replacing the swing
Continued
Содержание IRB 1100
Страница 1: ...ROBOTICS Product manual IRB 1100 ...
Страница 2: ...Trace back information Workspace 20B version a15 Checked in 2020 06 01 Skribenta version 5 3 033 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 36: ...This page is intentionally left blank ...
Страница 588: ...This page is intentionally left blank ...
Страница 610: ...This page is intentionally left blank ...
Страница 614: ......
Страница 615: ......