
Note
Action
xx1800002494
Remove the screws and washers.
9
Cooling pad location
xx1800003603
Carefully lift out the motor.
CAUTION
A cooling pad is attached to the motor, which may
stick to the casting. Always use a plastic sheet
with caution to remove the pad from the casting.
Pay attention not to scratch the casting or damage
the pad.
CAUTION
Be aware of the motor cabling. The motor cannot
be removed completely until the connector is
disconnected, as shown in following step.
10
xx1800002496
Remove the timing belt from its groove on the
motor.
11
Separating the upper cable harness from the axis-2 gearbox
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
Continues on next page
506
Product manual - IRB 1100
3HAC064992-001 Revision: C
© Copyright 20192020 ABB. All rights reserved.
5 Repair
5.8.2 Replacing the axis-2 gearbox
Continued
Содержание IRB 1100
Страница 1: ...ROBOTICS Product manual IRB 1100 ...
Страница 2: ...Trace back information Workspace 20B version a15 Checked in 2020 06 01 Skribenta version 5 3 033 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 36: ...This page is intentionally left blank ...
Страница 588: ...This page is intentionally left blank ...
Страница 610: ...This page is intentionally left blank ...
Страница 614: ......
Страница 615: ......