![Zte ZXG10 BS21 Maintenance Manual Download Page 204](http://html1.mh-extra.com/html/zte/zxg10-bs21/zxg10-bs21_maintenance-manual_940269204.webp)
ZXG10 BS21 (V2.2) Compact Outdoor BTS for GSM Maintenance Manual
190
Confidential and Proprietary Information of ZTE CORPORATION
Feeder Connectors Replacement
1.
Tools
i.
LDF4 block cutting device
ii.
LDF4 block installation tools
iii.
Adjustable wrenches (2)
iv.
Hacksaw
v.
Assorted file
vi.
Paper knife
vii.
Adjustable hot air blower
viii.
Multimeter
ix.
Antenna feeder analyzer
2.
Preparation:
i.
Perform the fault observation and analysis and determine the
replacement is necessary.
ii.
Prepare a good spare part with the same type as that of the faulty
jumper.
iii.
Prepare a damp-proof bag and carton, as well as some labels for
identification.
3.
Procedure
i.
Power off all the ETRM modules on the PSM module panel.
ii.
Remove connectors at both ends of the feeder by an adjustable
wrench, and then check whether the connectors’ cores are broken.
iii.
Put the replaced faulty jumper a damp-proof bag, label it and mark
the type and fault. Store it properly in the carton. Label the carton
for easy identification and handling in the future.
iv.
Make a new connector in the way as described in the manual for
making connector in the package of the connector.
v.
Test the newly-made connector, especially test its connection and
disconnection through the multimeter.
Note:
Make the connector safely and avoid the personal injury due to improper use
of sharp tools.
Pay attention to the handling of the feeder leftover. If sundries such as copper
bits are filtered into the connector, the performance of the antenna feeder system
will be influenced.
During operations high above the ground, protect the tools being used to
prevent them from dropping and hurting personnel on the ground.
vi.
Connect the new connector and test the antenna feeder indexes.