![Zte ZXG10 BS21 Maintenance Manual Download Page 199](http://html1.mh-extra.com/html/zte/zxg10-bs21/zxg10-bs21_maintenance-manual_940269199.webp)
Appendix A - Replacement of Modules and Parts
Confidential and Proprietary Information of ZTE CORPORATION 185
iv.
Record all the connection location of the RF cable to be replaced
and connect the new cable to the original location later.
v.
Prepare a damp-proof bag and carton, as well as some labels for
the identification.
3.
Procedure
i.
Make sure to turn off the power of the corresponding ETRM
(including PA and TRU) before replacing the transmitting tributary
cable. The power switch of the ETRM module is located on the front
panel of the PSM module.
ii.
Screw the SAM or N connectors at both ends of RF cable to remove
this cable.
iii.
Put the replaced faulty RF cable in a damp-proof bag, label it and
mark the type and fault. Store it properly in the carton. Label the
carton for easy identification and handling in the future.
iv.
Connect the new RF cable according to the former connection
method.
Note:
During the operation process, make sure to use force evenly. When screwing
the SMA connector, never use violent force; the correct method is to screw the
SMA connector with proper force, and at the same time, rock it to left and right to
make it align with the socket and avoid damaging it.
v.
Power on the ETRM (including PA and TRU) again.
4.
Confirmation after replacement
i.
Observe the indicators of running boards. If the indicator is normal,
the replacement is basically successfully.
ii.
Make a test call to check whether the BS runs normally after the
replacement.
Antenna Feeder Lightning
Arrester replacement
1.
Tools
i.
Straight screwdriver
ii.
Slip joint pliers
iii.
Adjustable wrenches
iv.
Multimeter
v.
Antenna feeder analyzer (SITE MASTER)
2.
Preparation
i.
Perform the fault observation and analysis and determine the fault
and whether it is necessary for a replacement.