![YSI 2700 SELECT User Manual Download Page 39](http://html.mh-extra.com/html/ysi/2700-select/2700-select_user-manual_915292039.webp)
2-26
Once the installed membranes and probes are equilibrated, the probe baseline current typically
runs below 2 nA. This equilibration may take a day or two and does not usually affect operation
during the first day since autocalibrations compensate for probe current drift.
When enzyme membrane replacements are required in the future, stabilization will occur much
more rapidly, usually within several minutes of installation, if there has been no power
disruption to the instrument.
Summary of Contents for 2700 SELECT
Page 1: ... Biochemistry Analyzer Who s Minding the Planet find out at ...
Page 4: ...iii A 1 B 1 C 1 D 1 0 1 E 1 2 F 1 3 4 5 2 G 1 6 7 H 1 I 1 ...
Page 43: ...3 4 Figure 3 2 Sampling Stations Figure 3 3 The Test Tube Holder Pivoted Out ...
Page 49: ...3 10 ...
Page 95: ...5 26 ...
Page 103: ...6 8 ...
Page 117: ...7 14 ...
Page 143: ...9 18 ...
Page 153: ...D 2 ...
Page 155: ...E 2 ...
Page 159: ...F 4 ...
Page 160: ...G 1 Figure G 1 Line Power Cord and Plug Wiring ...
Page 161: ...G 2 ...
Page 163: ...H 2 ...