9-3
IM CW120-E
Electric Energy Measurement
9
9.2
Starting and Stopping Integration
9.2.1 Starting Procedures
There are three ways to start integration:
• Manual start:
Pressing the
key for one second or more starts
integration.
• Automatic start at the specified time on the specified date: Setting the
start date and time via the setting screen and
pressing the
key puts the meter into the
integration standby state. After this, when the
specified time is reached, integration begins.
• Remote start by external control signal: A signal input from the external
control terminals starts integration. For details, see
Section 9.6, “External Control Input/Output.”
Manual Start
Press the
key for one second or more. Then, the
mark appears
on the screen, the LED status indicator immediately above the
key lights
up, and integration starts. If data saving to the PC card is enabled (see
Section 7.2.10), the file number of the file to which the data is to be saved is
displayed at the same time. After two seconds, the file number display
disappears and the measurement screen returns.