3
-22
PERIODIC MAINTENANCE
TIP
The spring preload setting is determined by
measuring the distance “c” shown in the illustra-
tion. The shorter distance “c” is, the higher the
spring preload; the longer distance “c” is, the
lower the spring preload.
Rebound damping (right side only)
NOTICE
ECA13590
Never go beyond the maximum or minimum
adjustment positions.
1. Adjust:
• Rebound damping
a. Turn the adjusting screw “1” in direction “a”
or “b”.
TIP
• Although the total number of clicks of a damp-
ing force adjusting mechanism may not exactly
match the above specifications due to small
differences in production, the actual number of
clicks always represents the entire adjusting
range. To obtain a precise adjustment, it would
be advisable to check the number of clicks of
each damping force adjusting mechanism and
to modify the specifications as necessary.
• When turning the damping force adjusting bolt
in direction “a”, the 0 click position and the 1
click position may be the same.
Compression damping (left side only)
NOTICE
ECA13590
Never go beyond the maximum or minimum
adjustment positions.
1. Adjust:
• Compression damping
Spring preload
Adjustment value (Soft)
19.0 mm (0.75 in)
Adjustment value (STD)
14.0 mm (0.55 in)
Adjustment value (Hard)
4.0 mm (0.16 in)
Direction “a”
Rebound damping is increased (sus-
pension is harder).
Direction “b”
Rebound damping is decreased (sus-
pension is softer).
c
Rebound damping
Adjustment value from the start
position (Soft)
11
Adjustment value from the start
position (STD)
6
Adjustment value from the start
position (Hard)
1
* Start position: With the adjusting screw
fully turned in direction “a”
1
b
a
Summary of Contents for XSR900 2022
Page 1: ...2022 SERVICE MANUAL XSR 900 BEA 28197 E0 MTM890 ...
Page 2: ......
Page 6: ......
Page 8: ......
Page 28: ...1 19 SPECIAL TOOLS ...
Page 44: ...2 15 CABLE ROUTING Handlebar side view 6 7 8 10 9 8 7 1 2 3 6 5 4 A 5 C 9 10 11 12 2 1 3 D B ...
Page 46: ...2 17 CABLE ROUTING Main switch left side view A 5 4 2 B 4 3 2 1 C 2 D 2 5 5 ...
Page 72: ...2 43 CABLE ROUTING Fuel tank left side view 1 2 3 4 5 6 A 1 7 C 4 5 B 4 D E 8 3 9 4 H 5 G 5 F ...
Page 74: ...2 45 CABLE ROUTING Canister H D F F E 7 7 8 G D 2 A 1 B 3 4 B C D I 5 6 D 1 ...
Page 78: ...2 49 CABLE ROUTING Radiator right side view H G F D C E 3 4 2 B A 1 ...
Page 80: ...2 51 CABLE ROUTING Water pump left side view 3 4 2 A C D B F 1 E ...
Page 84: ...2 55 CABLE ROUTING ...
Page 118: ...3 32 PERIODIC MAINTENANCE ...
Page 314: ...5 97 TRANSMISSION ...
Page 330: ...6 15 WATER PUMP ...
Page 347: ......
Page 353: ...8 6 IGNITION SYSTEM ...
Page 359: ...8 12 ELECTRIC STARTING SYSTEM ...
Page 363: ...8 16 CHARGING SYSTEM ...
Page 398: ...8 51 ELECTRICAL COMPONENTS ...
Page 417: ...9 11 SYSTEM DIAGRAM ...
Page 437: ...9 31 CRUISE CONTROL SYSTEM ...
Page 723: ......
Page 724: ......