2 - 19
SPEC
CABLE ROUTING DIAGRAM
1
Air vent hose
2
Spark plug lead
3
Starter cable
4
Throttle cable
5
Clutch cable
6
Clamp
7
Cable guide
8
Engine oil breather hose
9
Overflow hose
Å
After clamping the starter cable, push it against the starter plunger.
ı
Put the tip of the air vent hose into the main pipe.
Ç
Install the primary coil terminal (orange) to the ignition coil.
Î
Fasten the ground lead together with the ignition coil.
‰
Pass the clutch cable on the inside of the throttle and starter cable.
Ï
Clamp the clutch cable with the paint in the cable guide bottom recess.
Ì
Pass the throttle cable and starter cable into the cable guide.
Ó
Pass the engine oil breather hose and overflow hose between the right
half of the swingarm and pillar tube.
È
Clamp the engine oil breather hose, overflow hose and air vent hose to
2 clicks.
Summary of Contents for TT-R125LW
Page 47: ...GEN INFO MEMO ...
Page 63: ...GEN INFO MEMO ...
Page 78: ...SPEC 2 11 MAINTENANCE SPECIFICATIONS Cylinder head tightening sequence ...
Page 95: ...SPEC 2 11 CARACTÉRISTIQUES D ENTRETIEN Ordre de serrage de la culasse ...
Page 112: ...SPEC 2 11 WARTUNGSDATEN Anzugsreihenfolge Zylinderkopfschrauben ...
Page 119: ...SPEC MEMO ...
Page 135: ...INSP ADJ MEMO ...
Page 461: ... ELEC MEMO ...