XBLUE Networks
37
Installation
Ini
tialization Pr
ocedure
4
Initialization
Procedure
Once all of the Modules are installed into the system, and it is properly mounted, grounded
and cross connected it is time to initialize and power up the system. It is important to ini-
tialize the system to ensure the integrity of the database.
1.
Make Sure that the power is turned off.
2.
Locate the “RAM” switch on the front panel and turn it to the off position. If the RAM
switch is already in the off position, skip directly to step 3.
3.
Leave the RAM Switch in the off position for 30 seconds and then switch it to the on
position.
4.
The system has now been restored to factory default.
•
All CO Lines will ring extensions, including SLT extensions.
•
All extensions can take and place calls and the Toll Restriction is at Default
RAM
Power
Switch
Switch
Summary of Contents for 45P
Page 1: ...45p Installation Maintenance Manual...
Page 14: ...Introduction 14 XBLUE Networks 1 Related Documents...
Page 38: ...Installation 38 XBLUE Networks Initialization Procedure 4...
Page 116: ...Telephone Operation 116 XBLUE Networks Warning Tone CO Line Call Limiter 5...
Page 138: ...CO Line 138 XBLUE Networks Privacy Rls 6 2...
Page 183: ...XBLUE Networks 183 Restriction Least Cost Routing 6 5 Notes...
Page 196: ...Control 196 XBLUE Networks System Cold Start 6 6...
Page 220: ...Voice Processing System 220 XBLUE Networks 7 Main Programming Menu General Company Settings...
Page 226: ...Voice Processing System 226 XBLUE Networks 7 Voice Processing Programming Flow...
Page 232: ...232 XBLUE Networks i...
Page 241: ...Part Number 45PIM Copyright 2006 XBLUE Networks LLC...