Operation
Remote Programming of Output Voltage and Current Limit
60
Operating Manual for XKW 3kW Series Power Supply
Programming Output Current Limit with a 0-10Vdc Source
1. Set jumper JMP2 to its A-B location.
2. Remove the jumpers connecting pins 10 to 11 and 22 to 23 on connector J3.
3. Connect the external current programming source between pins 10 (current limit
programming input/positive) and 12 (return).
Varying the programming voltage from 0 to 10Vdc will cause the output current limit
to vary from 0 to 100% of the model rating. The output voltage is set locally by
adjusting the front panel voltage control.
Note:
Resetting internal jumpers may require a recalibration of the programming circuit to
maintain programming accuracy. See
“Calibrating for Programming Accuracy” on
page 82
.
Figure 3.10
Programming Output Current Limit with a 0-10Vdc Source
WARNING
Exercise caution when resetting internal jumpers. Follow the procedures for
removing the cover and resetting jumpers in
“Configuring for Remote
Programming, Sensing, and Monitoring” on page 48
.
+
0 - 10 V
J3
A
B
C
JMP 2
TM-25OP-01XN.book Page 60 Monday, April 5, 2004 8:58 AM
Summary of Contents for XKW 12-150
Page 2: ......
Page 3: ...Operating Manual for XKW 3000 Watt Series Programmable DC Power Supply...
Page 14: ...xii Operating Manual for XKW 3kW Series Power Supply...
Page 18: ...List of Tables xvi Operating Manual for XKW 3kW Series Power Supply...
Page 28: ...Features and Specifications Specifications 26 Operating Manual for XKW 3kW Series Power Supply...
Page 48: ...Installation Using Remote Sensing 46 Operating Manual for XKW 3kW Series Power Supply...
Page 80: ...Operation Using Multiple Supplies 78 Operating Manual for XKW 3kW Series Power Supply...
Page 89: ......