Installation
Functional Tests
Revision A
35
Functional Tests
Before connecting the unit to an AC outlet, make sure that the power switch is in the
OFF position and that the voltage and current controls are turned fully counter
clockwise. Check that the J3 mating connector on the rear of the unit is in place with
jumpers connected for local operation as shown below. (This is the default
configuration as shipped from the factory). Connect the unit to a 230 Vac grounded
outlet and switch the unit on. After a short power on delay the front panel meters
should light up with both displays reading zero.
Figure 2.3
Connector J3 Configuration for Local Operation
Voltage Mode
Operation
To check voltage mode operation, proceed as follows:
1. Connect a DVM, rated better than 0.5% accuracy, to the rear output terminals,
observing correct polarity.
2. Rotate the CURRENT control 1/2 turn clockwise. Slowly rotate the VOLTAGE
control clockwise and observe both the internal and external meters. Minimum
control range should be from zero to the maximum rated output. Compare the
test meter reading with the front panel voltmeter reading. Check that the green
voltage mode indicator led is ON.
3. Set the POWER switch to OFF.
TM-25OP-01XN.book Page 35 Monday, April 5, 2004 8:58 AM
Summary of Contents for XKW 12-150
Page 2: ......
Page 3: ...Operating Manual for XKW 3000 Watt Series Programmable DC Power Supply...
Page 14: ...xii Operating Manual for XKW 3kW Series Power Supply...
Page 18: ...List of Tables xvi Operating Manual for XKW 3kW Series Power Supply...
Page 28: ...Features and Specifications Specifications 26 Operating Manual for XKW 3kW Series Power Supply...
Page 48: ...Installation Using Remote Sensing 46 Operating Manual for XKW 3kW Series Power Supply...
Page 80: ...Operation Using Multiple Supplies 78 Operating Manual for XKW 3kW Series Power Supply...
Page 89: ......