Operation
Configuring for Remote Programming, Sensing, and Monitoring
48
Operating Manual for XKW 3kW Series Power Supply
Configuring for Remote Programming, Sensing, and Monitoring
This section lists switch, connector, and jumper functions for the power supply.
Subsequently, it provides a location diagram, gives procedures for resetting the
internal jumpers and switches, and covers reconfiguring or making connections to
the J3 connector.
You will find remote programming procedures and diagrams covered in more detail
in
“Remote Programming of Output Voltage and Current Limit” on page 54
, remote
sensing in
“Local and Remote Sensing” on page 43
,
and
remote monitoring of
readback signals and status indicators in
“Remote Monitoring of Readback Signals
and Status Indicators” on page 72
.
Programming,
Monitoring,
and Control
Functions
Front Panel REM/LOC Switch
You can use the REM/LOC (Remote/Local
Programming) switch for remote programming. When set to REM (Remote
Programming), control of BOTH output voltage AND current limit is passed to
external voltage and/or current sources which are connected to the J3 connector.
Resetting the switch to LOC returns the supply to local (front panel) control. See
“Remote Programming of Output Voltage and Current Limit” on page 54
for more
information about using this switch.
External J3 Connector
The external J3 connector provides user access to the following functions:
•
Remote programming of output voltage OR current limit, and for OVP
•
Remote monitoring of the following readback signals and status indicators
•
Remote programming of the shutdown function using AC, DC, or TTL
compatible signals
•
Remote sensing of output voltage
See
Figure 3.1
.
Readback Signals
Status Indicators
•
Calibrated output voltage
•
Calibrated output current
•
Thermal shutdown
•
OVP circuit
•
Remote/local programming mode
TM-25OP-01XN.book Page 48 Monday, April 5, 2004 8:58 AM
Summary of Contents for XKW 12-150
Page 2: ......
Page 3: ...Operating Manual for XKW 3000 Watt Series Programmable DC Power Supply...
Page 14: ...xii Operating Manual for XKW 3kW Series Power Supply...
Page 18: ...List of Tables xvi Operating Manual for XKW 3kW Series Power Supply...
Page 28: ...Features and Specifications Specifications 26 Operating Manual for XKW 3kW Series Power Supply...
Page 48: ...Installation Using Remote Sensing 46 Operating Manual for XKW 3kW Series Power Supply...
Page 80: ...Operation Using Multiple Supplies 78 Operating Manual for XKW 3kW Series Power Supply...
Page 89: ......