Installation
Inspection, Cleaning, and Packaging
28
Operating Manual for XKW 3kW Series Power Supply
Inspection, Cleaning, and Packaging
Initial
Inspection
When you first receive your unit:
1. Inspect the unit for scratches and cracks, and for broken switches, connectors,
and displays.
2. Have the service technician check the printed circuit board and its components
if you suspect internal damage.
If the unit is damaged, save all packing materials and notify the carrier immediately.
See packing instructions on
page 29
.
Periodic
Cleaning
No routine servicing of the power supply is required except for periodic cleaning.
Whenever a unit is removed from operation, clean metal surfaces with naphtha or an
equivalent solvent and the front panel with a weak solution of soap and water. Use
low-pressure compressed air to blow dust from in and around components on the
printed circuit boards.
TM-25OP-01XN.book Page 28 Monday, April 5, 2004 8:58 AM
Summary of Contents for XKW 12-150
Page 2: ......
Page 3: ...Operating Manual for XKW 3000 Watt Series Programmable DC Power Supply...
Page 14: ...xii Operating Manual for XKW 3kW Series Power Supply...
Page 18: ...List of Tables xvi Operating Manual for XKW 3kW Series Power Supply...
Page 28: ...Features and Specifications Specifications 26 Operating Manual for XKW 3kW Series Power Supply...
Page 48: ...Installation Using Remote Sensing 46 Operating Manual for XKW 3kW Series Power Supply...
Page 80: ...Operation Using Multiple Supplies 78 Operating Manual for XKW 3kW Series Power Supply...
Page 89: ......