Notice
Date
Page
01201055
INSTRUCTION
HANDBOOK
9. Installation
0102
14
9
Installation of the exhaust of
burn gas
- Connect the whole set of pipes on your
cheminey pipe, that is to say :
- 1 aluminium pipe (A) lenght 500 mm (20")
on the exchanger.
-1 T-square (B) pipe + 1 regulator (C).
-1 aluminium pipe (A) length 500 mm (20") .
-1 draught accelerator (D).
It is necessary to install the gas
exchanger at the ground level.
Evacuation of burn gas from a machine with gas heating must never be
connected to the evacuation used for a dry cleaning machine or other
machine of the same type.
Ø 125
>0,50 m
<1,80 m
P
D
A
B
A
C
50
0
50
0
A
5 x A
D0693
Installation of the chemney regulator
For a correct running of the installation, this
chimney regulator must always have its axle
of rotation of his flap perfectly horizontal.
The adjustment toothed wheel has to be
positioned on the mark no 7.
D0435
0
1
2
3
4
5
7
6
8
9