Project planning with acceleration apertures
It may be necessary to increase the system's transport time in order to meet
individual requirements. For this purpose, acceleration apertures can be
planned at the end of the pipe branch, which will increase the transport rate.
For the design of pipe systems with acceleration apertures, please refer to
the following table for aspiration holes and particular pipe configuration. Fur-
thermore compliance is required with special design tables for the design of
smoke aspiration systems with acceleration apertures (see appendix).
NOTICE
Due to physical properties, the detection of pipe rupture is derated when
using pipe systems with acceleration apertures.
5.3.5
Summary of Contents for TITANIUS TOP-SENS
Page 1: ...Air sampling smoke detection system Fire Detection TITANUS TOP SENS Rev a Technical Manual ...
Page 2: ......
Page 4: ......
Page 12: ...TITANUS TOP SENS Rev a Rev a 12 06 13 ...
Page 16: ......
Page 56: ......
Page 62: ...Design TITANUS TOP SENS Rev a 62 06 13 Figure 32 Pipe designs ...
Page 72: ...Design TITANUS TOP SENS Rev a 72 06 13 ...
Page 140: ...Installation TITANUS TOP SENS Rev a 140 06 13 Figure 77 Connecting the TITANUS ...
Page 148: ......
Page 204: ......
Page 206: ......
Page 210: ......
Page 216: ......
Page 226: ......
Page 240: ......
Page 246: ...TITANUS TOP SENS Rev a Glossary TS_A_Glossar en e DOC Data 04 09 ...
Page 247: ......
Page 248: ......
Page 249: ...TITANUS TOP SENS Rev a 06 13 205 ...
Page 250: ...TITANUS TOP SENS Rev a ...