Design
TITANUS
TOP·SENS
®
/Rev.a
70
06/13
Sensitivity and pipeline project planning
Pipeline project planning with pipe accessories
The following project planning tables for pipeline project planning can be
found in the appendix for each previously selected pipe accessory.
▪ Project planning without filter
▪ Project planning with LF-AD air filter
▪ Project planning with LF-AD-1 air filter
▪ Project planning with LF-AD-2 air filter
▪ Project planning with SF-400 / SF-650 air filter
NOTICE
An area can be monitored with more than detection points than required by
the national guideline in order to improve an air sampling smoke detection
system’s detection quality. In such case, the number of normatively re-
quired sampling points is to be used in calculating the required sensitivity of
an air sampling smoke detection system.
5.2.3
5.2.3.1
Summary of Contents for TITANIUS TOP-SENS
Page 1: ...Air sampling smoke detection system Fire Detection TITANUS TOP SENS Rev a Technical Manual ...
Page 2: ......
Page 4: ......
Page 12: ...TITANUS TOP SENS Rev a Rev a 12 06 13 ...
Page 16: ......
Page 56: ......
Page 62: ...Design TITANUS TOP SENS Rev a 62 06 13 Figure 32 Pipe designs ...
Page 72: ...Design TITANUS TOP SENS Rev a 72 06 13 ...
Page 140: ...Installation TITANUS TOP SENS Rev a 140 06 13 Figure 77 Connecting the TITANUS ...
Page 148: ......
Page 204: ......
Page 206: ......
Page 210: ......
Page 216: ......
Page 226: ......
Page 240: ......
Page 246: ...TITANUS TOP SENS Rev a Glossary TS_A_Glossar en e DOC Data 04 09 ...
Page 247: ......
Page 248: ......
Page 249: ...TITANUS TOP SENS Rev a 06 13 205 ...
Page 250: ...TITANUS TOP SENS Rev a ...