Installation of the pipe system
06/13
155
Patented aspiration apertures
Figure 87: Example of an aspiration aperture with aspiration-reducing film sheet
Design aspiration apertures (bore holes) and their positioning according to
project requirements and pipe design guidelines.
1. Bore a hole with a 10mm drill at a right angle to the pipe.
2. Carefully deburr the holes.
3. Clean the area around the hole (around the whole pipe) from dirt and
grease with Tangit cleaner.
4. Select the size of the aspiration-reducing film sheet according to the
pipe design guidelines.
5. Stick the aspiration-reducing film sheet over the bore hole (see following
figure point 1).
6. Prevent the film sheet from coming loose by sticking marking tape over it
(see following figure point 2).
NOTICE
The perforations in the aspiration-reducing film sheet and the marking tape
are to be placed exactly on the hole in the pipe. The diameter of the perfo-
ration in the aspiration-reducing film sheet must not be changed.
Avoid touching the adhered in order to keep it free from dust and fat.
7.3
Aspiration aperture
Air sampling holes
Summary of Contents for TITANIUS TOP-SENS
Page 1: ...Air sampling smoke detection system Fire Detection TITANUS TOP SENS Rev a Technical Manual ...
Page 2: ......
Page 4: ......
Page 12: ...TITANUS TOP SENS Rev a Rev a 12 06 13 ...
Page 16: ......
Page 56: ......
Page 62: ...Design TITANUS TOP SENS Rev a 62 06 13 Figure 32 Pipe designs ...
Page 72: ...Design TITANUS TOP SENS Rev a 72 06 13 ...
Page 140: ...Installation TITANUS TOP SENS Rev a 140 06 13 Figure 77 Connecting the TITANUS ...
Page 148: ......
Page 204: ......
Page 206: ......
Page 210: ......
Page 216: ......
Page 226: ......
Page 240: ......
Page 246: ...TITANUS TOP SENS Rev a Glossary TS_A_Glossar en e DOC Data 04 09 ...
Page 247: ......
Page 248: ......
Page 249: ...TITANUS TOP SENS Rev a 06 13 205 ...
Page 250: ...TITANUS TOP SENS Rev a ...