Special project planning
Simplified project planning is used for equipment protection and in rooms
with small dimensions. The advantage in this project planning is the uniform
diameters of the aspiration apertures.
The specifications according to Chapter apply to project planning. The fol-
lowing limit values and aperture diameters should also be taken into ac-
count. Additional accessories (air filters, condensation separators, etc.) can
influence the maximum pipe length.
I-pipe system
1 pipe system and 2 pipe systems
Figure 43: I-pipe system, such as for equipment protection
Min. distance from TITANUS
®
to 1st aspiration aperture
2 m
Max. distance from TITANUS
®
to 1st aspiration aperture
20 m
Max. distance from the 1
st
aspiration aperture to the last aspiration
aperture
20 m
Max. overall pipe length Ø 25 mm
40 m
Max. number of aspiration apertures (n) per pipe system
18 no.
Minimum distance between aspiration apertures (d)
0.1 m
Maximum distance between aspiration apertures (d)
4 m
5.3.2
5.3.2.1
pipe systems
Limit values
Summary of Contents for TITANIUS TOP-SENS
Page 1: ...Air sampling smoke detection system Fire Detection TITANUS TOP SENS Rev a Technical Manual ...
Page 2: ......
Page 4: ......
Page 12: ...TITANUS TOP SENS Rev a Rev a 12 06 13 ...
Page 16: ......
Page 56: ......
Page 62: ...Design TITANUS TOP SENS Rev a 62 06 13 Figure 32 Pipe designs ...
Page 72: ...Design TITANUS TOP SENS Rev a 72 06 13 ...
Page 140: ...Installation TITANUS TOP SENS Rev a 140 06 13 Figure 77 Connecting the TITANUS ...
Page 148: ......
Page 204: ......
Page 206: ......
Page 210: ......
Page 216: ......
Page 226: ......
Page 240: ......
Page 246: ...TITANUS TOP SENS Rev a Glossary TS_A_Glossar en e DOC Data 04 09 ...
Page 247: ......
Page 248: ......
Page 249: ...TITANUS TOP SENS Rev a 06 13 205 ...
Page 250: ...TITANUS TOP SENS Rev a ...