Main Processing Board Installation
3-15
Chapter 3 - System Installation
Removing a PCB
Reverse the
Inserting a PCB
procedure. Installation method of the PCB is shown in
Figure 3-9
.
There is a ground tab located on the top and bottom of each PCB toward the front end of the
card. There is also a ground tab located to the right of each card guide in each cabinet. Make
sure when the PCBs are inserted into the card guide and secured in their respective card slots,
that the ground tab on each card mates with the ground tab on each card guide. This ensures
a good ground potential to reduce RFI and EMI interference possibilities.
Figure 3-9: PCB Installation
Main Processing Board Installation
The Main Processing Board (MPB) is installed in the MPB PCB card slot (slot MPB) of Cabinet 0.
The MPB may be equipped with 2 add-on boards, a PMU for software programming and a
MODU for modem access to the system.
Lithium Battery
The MPB contains a lithium dry-cell to maintain memory and real-time clock functions. The
battery is soldered on the MPB and connected to the circuitry by the ON-OFF Dip Switch.
Make sure the switch is set to the ON position before installing the MPB.
Summary of Contents for STARPLUS Triad XTS
Page 1: ...STARPLUSTM Triad XTS Installation...
Page 10: ...N O T E S...
Page 20: ...1 12 Product Description Chapter 1 Introduction...
Page 22: ...N O T E S...
Page 36: ...N O T E S...
Page 42: ...3 8 KSU Installation Chapter 3 System Installation Figure 3 4 Mounting Cabinets 0 1 2 48 3...
Page 77: ...CO PBX Connections 3 43 Chapter 3 System Installation Figure 3 25 Case 2 of Clock Chain...
Page 79: ...CO PBX Connections 3 45 Chapter 3 System Installation Figure 3 27 Case 4 of Clock Chain...
Page 104: ...N O T E S...
Page 134: ...4 32 VOIP Maintenance and Troubleshooting Chapter 4 Maintenance and Troubleshooting...
Page 138: ...iv Index...