CO/PBX Connections
3-29
Chapter 3 - System Installation
The T1IB contains 2 switches (SW1 and SW3) and 3 connectors (CN1, CN2 and CN3). The clock
selection switch is used for control synchronous clock. The Line Build-Out switch is controlled
by distance between the
XTS
Systems and a CSU and SW1 #4 is used for loopback control.
The clock control cable should be connected by a daisy-chain method when more than one
T1IB board is installed. When the clock control cable of the T1IB is connected by daisy-chain
method, the clock selection switch of the first T1IB must be placed in the Enable position and
the other board should be placed in the Disable position. The Line Build-Out switch must be
selected by distance between the
XTS
System and a CSU and the switch selection as indicated
in the following chart. If the CSU is located near the KSU, all LBO switches should be ON.
The SW1 switch #4 of the Line Build-Out switch is used for LoopBack control. Its switch is used
only for hardware test and must be placed in the ON position for normal operation.
Table 3-6: T-1 Board LEDs
LED #
Meaning
Function
1
IN USE
At least one of the 24 circuits is in use.
2
RED
T1IB is in Red alarm due to any alarm.
3
H/W TEST
Normal call processing is not available.
4
BLUE.
T1IB has detected RX_BLUE alarm.
5
YELLOW
T1IB has detected RX_YELLOW alarm.
6
OOF
T1IB is Out of Frame synchronization.
7
RCL
T1IB receives Carrier Loss (unplugged from the cable)
8
CLOCK
Clock Enable/Disable
Table 3-7: T-1 Ordering Information
T-1 Ordering Information
Ringer Equivalent Number
6.0P
Facility Line Interface
04DU9-B
Jack Type
RJ45
Table 3-8: T-1 Switch Positions
Distance
Switch #
1
2
3
4
0 to 133 feet
on
on
on
on
133 to 266 feet
off
on
on
on
266 to 399 feet
on
off
on
on
399 to 533 feet
off
off
on
on
533 to 655 feet
on
on
off
on
Summary of Contents for STARPLUS Triad XTS
Page 1: ...STARPLUSTM Triad XTS Installation...
Page 10: ...N O T E S...
Page 20: ...1 12 Product Description Chapter 1 Introduction...
Page 22: ...N O T E S...
Page 36: ...N O T E S...
Page 42: ...3 8 KSU Installation Chapter 3 System Installation Figure 3 4 Mounting Cabinets 0 1 2 48 3...
Page 77: ...CO PBX Connections 3 43 Chapter 3 System Installation Figure 3 25 Case 2 of Clock Chain...
Page 79: ...CO PBX Connections 3 45 Chapter 3 System Installation Figure 3 27 Case 4 of Clock Chain...
Page 104: ...N O T E S...
Page 134: ...4 32 VOIP Maintenance and Troubleshooting Chapter 4 Maintenance and Troubleshooting...
Page 138: ...iv Index...