84
Coding
Code 2
(cont.)
Coding in the delivered condition
Possible change
Boiler/burner (two−stage)
(cont.)
12
:
20
Switch−off delay
(integral) = 2 560 Ks
12
:
0
to
12
:
199
Shutdown delay for
blocking stage 1 (to stage
2) adjustable from 0 to
25
472Ks
1 setting step
¢
128Ks
Boiler/burner (modulating)
13
:
6
Shutdown differential 6K
The burner is switched OFF
13
:
0
Without shutdown
differential
when the set boiler water
temperature is exceeded
13
:
1
to
13
:
20
Shutdown differential
adjustable from 1 to 20K
15
:
15
Actuator run time
15s
15:
7
to
15
:
180
Operating time adjustable
from 7 to 180s
16
:
6
Mod. burner start−up
optimisation offset
6K
16
:
0
to
16
:
15
Offset adjustable
from 0 to 15K
17
:
12
Control amplification 12
17
:
0
to
17
:
255
Adjustment subject to the
modulating burner being
matched to the respective
18
:
300
Integral time 300
18:
1
to
18
:
1000
p
boiler type
1A
:
6
Start−up optimisation 6min 1A:
0
to
1A
:
60
Duration of start−up
optimisation adjustable
from 0 to 60min
Boiler/burner
1C
:
120
Compensation of signal
delay for hours run meter.
Time from burner start
signal initiation at T2
(plug
fA
) to opening of the
solenoid valve.
At each burner start 120s
will be taken off the
operating time
1C
:
1
to
1C
:
199
Setting range
from 1 to 199s
Each time the burner starts
up, the operating time is
reduced by this amount
5862700GB