Venting the boiler
1.
Close the shut-off valves on the
heating water side.
2.
Connect the drain hose to valve
B
and connect it to a drain outlet.
3.
Open valves
A
and
B
, and vent
at mains pressure until no sound of
escaping air can be heard.
4.
Close valves
A
and
B
and open
the heating water shut-off valves.
Venting the heating system
1.
Close the gas shut-off valve and
switch ON the control unit.
2.
Activate the venting program via
coding "2F:1".
Note
To call up code 1 and for setting the
coding address, see page 66.
For function and sequence of the
venting program, see page 121.
Whilst the venting program runs,
the display shows "EL" (constant
temperature control unit) or
"Venting" (weather-compensated
control unit).
Further details regarding the individual steps
(cont.)
25
Commissioning, inspection, maintenance
5592
883
GB
Service
Summary of Contents for VITODENS 343-F WS4A
Page 137: ...Parts lists cont 137 Parts lists 5592 883 GB Service ...
Page 138: ...Parts lists cont 138 Parts lists 5592 883 GB ...
Page 139: ...Parts lists cont 139 Parts lists 5592 883 GB Service ...
Page 140: ...Parts lists cont 140 Parts lists 5592 883 GB ...
Page 141: ...Parts lists cont 141 Parts lists 5592 883 GB Service ...
Page 142: ...Parts lists cont 142 Parts lists 5592 883 GB ...
Page 151: ...151 5592 883 GB ...