For further details regarding faults,
see page 92.
Checking the static and supply pressure
Danger
Higher CO emissions can lead to poisoning.
Check the CO emissions before and after any work on gas appliances, to
prevent any health hazards and to ensure the perfect operational condi-
tion of the system.
Operation with LPG
Flush the LPG tank twice during commissioning/replacement. Thoroughly vent
the tank and gas supply lines after flushing.
1.
Close the gas shut-off valve.
2.
Undo the screw inside test connec-
tor "PE"
A
at the gas train but do
not remove it, and connect the
pressure gauge.
3.
Open the gas shut-off valve.
4.
Check the static pressure; it should
be a max. of 57.5 mbar. Record the
actual value in the service report.
5.
Start the compact boiler.
Note
During commissioning, the boiler
can enter a fault state because of
airlocks in the gas pipe. After
approx. 5 s, press "
E
RESET" to
reset the burner.
Further details regarding the individual steps
(cont.)
33
Commissioning, inspection, maintenance
5592
883
GB
Service
Summary of Contents for VITODENS 343-F WS4A
Page 137: ...Parts lists cont 137 Parts lists 5592 883 GB Service ...
Page 138: ...Parts lists cont 138 Parts lists 5592 883 GB ...
Page 139: ...Parts lists cont 139 Parts lists 5592 883 GB Service ...
Page 140: ...Parts lists cont 140 Parts lists 5592 883 GB ...
Page 141: ...Parts lists cont 141 Parts lists 5592 883 GB Service ...
Page 142: ...Parts lists cont 142 Parts lists 5592 883 GB ...
Page 151: ...151 5592 883 GB ...