74
4.
Check the system pressure at pres-
sure gauge
A
and top up with water
if required.
Minimum system pressure: 0.8 bar
Permiss. operating pressure: 3.0 bar
5.
Place the control panel in its service
position; see page 86.
6.
Open programming unit; see
page 87.
7.
Remove separating plate; see
page 89.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5724 152 GB
Summary of Contents for AWS 104
Page 5: ...5 Certificates Declaration of conformity 119 Keyword index 120 Index Index cont 5724 152 GB...
Page 87: ...87 Opening programming unit 3 2 1 2x Troubleshooting Repairs cont 5724 152 GB Service...
Page 89: ...89 Removing separating plate 1 2 Troubleshooting Repairs cont 5724 152 GB Service...