33
C
D
C
D
4.
2.
3.
2x
Example type AWS/AWS-AC 104
C
Liquid gas line
D
Hot gas line
2.
!
Please note
Contamination (such as metal
swarf) or moisture must not
enter the copper pipes.
Therefore, hold the pipe open-
ings down or plug them.
Remove the nuts from the refrigerant
line fittings (hot gas and liquid gas
line).
Slide the nuts onto the refrigerant
lines prepared on site.
3.
Swage the pipe ends.
4.
Secure the pipes.
Tighten the nuts with the following torque:
Type
AWS/
AWS-AC
Line
Connection to
external unit
Torque in Nm
104
Liquid gas line
7
6 mm
⁷
⁄
₁₆
UNF
14–18
Hot gas line
7
12 mm
¾ UNF
50–62
Installation sequence
Connecting the refrigerant lines
(cont.)
5724 152 GB
Installation
Summary of Contents for AWS 104
Page 5: ...5 Certificates Declaration of conformity 119 Keyword index 120 Index Index cont 5724 152 GB...
Page 87: ...87 Opening programming unit 3 2 1 2x Troubleshooting Repairs cont 5724 152 GB Service...
Page 89: ...89 Removing separating plate 1 2 Troubleshooting Repairs cont 5724 152 GB Service...