TLS-450 Setup and Operation Screens Manual
203
Line Leak Report Passed Test Results
The Line Leak Reports - Passed Test Results displays information about most-recent and historical line
leak tests. This report area is visible only if your console has the PLLD option.
Report Column Descriptions
Test Type
•
First Annual (First 0.1 gph [0.38 lph] test passed for a given month)
•
First Periodic (First 0.2 gph [0.76 lph] test passed for a given month)
•
Last Annual (Last 0.1 gph test passed)
•
Last Gross (Last 3.0 gph [11.3 lph] test passed)
•
Last Periodic (Last 0.2 gph test passed)
There will only be one entry of Gross test history for each line.
Date and Time
This column lists the date and time of the test.
Test Method
This column lists the method of the line leak test, for example, Pressure Line Leak Detection (PLLD)